Ships Point Improvement District – Water System Upgrade

Pictured above our crews installing 200mm Blue Brute watermain as part of the Water System Upgrade for Ships Point Improvement District in 2014.

Project Completion Date: 2014

Phase 1 of the Ships Point Water Distribution Upgrade was completed in the spring of 2014

The upgraded and new components include:

  • New concrete block pump house
  • An upgraded electrical service c/w a 100KW back up generator
  • A new 200mm main and associated valving from the pump house to the junction of Tozer and Ships Point Rd
  • A 150 mm line and valving joining the Tozer line with the Vivien line via the fire lane